Download 000-385 free exam, solution courses 000-385 torrent ( training materials ) , Nowexam’s 000-385 study materials or IBM_certifications_II certified 000-385 real Q&As , When you first started and used the IBM high end tape solutions version3 certifications 000-385 questions and answers / 000-385 exam simulator,nowexam GUARANTEES that you will pass your 000-385 exams on your first attempt after using Nowexam Teaching Materials.Can help you 100% pass rate,guarantee your results.
According to the market needs,nowexam company provide the latest IBM_certifications_II IBM high end tape solutions version3 [000-385].nowexam is committed to relevant 000-385 training material (or called 000-385 Exam Topics).
Passing IBM 000-385 exams: Passing IBM high end tape solutions version3 exam has never been faster or easier, now with actual questions and answers, without the messy braindumps that are frequently incorrect. nowexam Unlimited Access Exams promise pass exams in the first attempt, or will give a full defund.
Nowexam 000-385 practice exams topics and study questions are composed by current and active Information Technology experts, who use their experience in preparing you for your future in IT.Share the latest 000-385 Study Guide and witness 000-385 test papers follows:1.A Request for Proposal (RFP) has been received describing the implementation of a centralized data  backup  solution.  The  customer  has  five  campus  buildings  inter-connected  with  100  Mb coaxial  Ethernet.  Every  building  has  three  servers  and  each  server  has  a  2 GB  database  that requires nightly backup. The backups must be completed in a four-hour window. A technical staff person  attending  an  IBM  road  show  heard  about  IBM  Tivoli  Storage  Manager  (ITSM)  and  is considering  implementing  this  solution. What  is  the  next  step  to  be  performed  by  a Business Partner representative?
A.Call IBM TechLine/PartnerLine to provide the solution
B.Commit to a six week trial of an integrated solution
C.Contact Tivoli for an analysis and software quote
D.Engage a technical specialist to develop a solution
Correct:D 
2.A customer is using Fast Dump Restore (FDR) to do vaulting and is sending 500 ECCST tapes offsite  each  day.  The  customer  is  upgrading  to  IBM  3590-E1A  drives  from  IBM  3490/36  track technology. Which of  the  following  indicates  the minimum number of  “J” cartridges, assuming maximum utilization of the capacity of the cartridges, that the customer would send offsite each day?
A.10
B.20
C.50
D.80
Correct:B 
3.A Data Center manager would  like  to  reduce  operational  storage management  requirements. They currently have an  IBM eServer zSeries, several  IBM eServer pSeries, and multiple non-IBM UNIX  servers  installed.  Each  system  uses  a  unique  backup  tool  with  various  types  of  tape systems. Which of the following would be the most complete solution to simplify operations and reduce storage management costs?
A.Use CA Unicenter to backup all installed servers.
B.Use Tivoli Storage Manager and DFSMShsm to provide backup of supported servers.
C.Install Tivoli Storage Manager to provide backup services for supported servers.
D.Install Tivoli Storage Manager for zSeries.
Correct:B 
4.A customer  is experiencing poor performance on  their VTS  for some of  their batch  tape  jobs. Which of the following IBMTools jobs should be run to help determine the nature of the problem?
A.J5SMF
B.J9FLAT
C.FIXSMF21
D.BADBLKSZ
Correct:D 
5.A customer is using Tivoli Storage Manager (TSM) on an IBM eServer zSeries system connected to their IBM TotalStorage Virtual Tape Server (3494) and six native IBM 3590E drives connected via ESCON. They want to migrate their TSM workload onto an IBM eServer pSeries system. After it is moved,  TSM  will  require  the  use  of  two  drives.  They  asked  the  IBM  Storage  Specialist  for  a recommendation on how  to connect  the  required  two drives. Which of  the  following should be recommended?
A.Connect two ESCON drives to the pSeries ESCON card.
B.Direct connect two drives to the pSeries server.
C.Install two 3590-B11s in the IBM 3494 Library for TSM to use.
D.Convert two 3590 drives to FICON and then attach them to the pSeries system.
Correct:B 
6.A  customer  utilizes  DFSMShsm  migration  level  2,  and  has  10000  3490E  extended  length cartridges. How many 3592 300GB cartridges would be required for this amount of data?
A.17
B.27
C.37
D.57
Correct:B
Share 000-385 pdf Braindumps the latest IBM courses and online IBM_certifications_II training resources,for pass 000-385 Exam topics provide study guide and informations.when you study 000-385 pdf dumps of IBM publishing,000-385 from IBM_certifications_II certification and you can easier to pass these certification, get for 000-385 materials identification.for certify nowexam’s Exam topics can pass 000-385 cetification,please you visit these demo IBM high end tape solutions version3,when you needs for get 000-385 (IBM high end tape solutions version3) identification.nowexam published 000-385 by IBM exam simulation questions,the exact nature to help the candidates to easily pass the exam, and get everyone’s praise.

Related Posts